Marknadens största urval
Snabb leverans

Ageing Management of Nuclear Power Plants during Delayed Construction Periods, Extended Shutdown and Permanent Shutdown Prior to Decommissioning

Om Ageing Management of Nuclear Power Plants during Delayed Construction Periods, Extended Shutdown and Permanent Shutdown Prior to Decommissioning

Provides a summarised description of internationally accepted practices. Examples of the national approaches to ageing management for the specific periods of extended shutdown, delayed construction and post final shutdown as applied in the nuclear power plants of participating IGALL Member States are presented.

Visa mer
  • Språk:
  • Engelska
  • ISBN:
  • 9789201079213
  • Format:
  • Häftad
  • Sidor:
  • 126
  • Utgiven:
  • 30 Juni 2021
  • Mått:
  • 210x297x0 mm.
  • Vikt:
  • 350 g.
  Fri leverans
Leveranstid: 2-4 veckor
Förväntad leverans: 23 Juli 2024

Beskrivning av Ageing Management of Nuclear Power Plants during Delayed Construction Periods, Extended Shutdown and Permanent Shutdown Prior to Decommissioning

Provides a summarised description of internationally accepted practices. Examples of the national approaches to ageing management for the specific periods of extended shutdown, delayed construction and post final shutdown as applied in the nuclear power plants of participating IGALL Member States are presented.

Användarnas betyg av Ageing Management of Nuclear Power Plants during Delayed Construction Periods, Extended Shutdown and Permanent Shutdown Prior to Decommissioning



Hitta liknande böcker
Boken Ageing Management of Nuclear Power Plants during Delayed Construction Periods, Extended Shutdown and Permanent Shutdown Prior to Decommissioning finns i följande kategorier:

Gör som tusentals andra bokälskare

Prenumerera på vårt nyhetsbrev för att få fantastiska erbjudanden och inspiration för din nästa läsning.