Marknadens största urval
Snabb leverans

Post-Project Monitoring of BMP's/SUDS to Determine Performance and Whole-Life Costs

Om Post-Project Monitoring of BMP's/SUDS to Determine Performance and Whole-Life Costs

The project is being conducted in two phases. Phase 1, which is the subject of this report, includes a literature review and a survey of stormwater authorities and organizations in the U.S. and U.K. to identify the most commonly used BMPs and SUDS and to determine the availability of data on their cost and performance.

Visa mer
  • Språk:
  • Engelska
  • ISBN:
  • 9781843397168
  • Format:
  • Häftad
  • Sidor:
  • 302
  • Utgiven:
  • 30. juni 2004
  • Mått:
  • 156x234x18 mm.
  Fri leverans
Leveranstid: 2-4 veckor
Förväntad leverans: 16. december 2024

Beskrivning av Post-Project Monitoring of BMP's/SUDS to Determine Performance and Whole-Life Costs

The project is being conducted in two phases. Phase 1, which is the subject of this report, includes a literature review and a survey of stormwater authorities and organizations in the U.S. and U.K. to identify the most commonly used BMPs and SUDS and to determine the availability of data on their cost and performance.

Användarnas betyg av Post-Project Monitoring of BMP's/SUDS to Determine Performance and Whole-Life Costs



Hitta liknande böcker
Boken Post-Project Monitoring of BMP's/SUDS to Determine Performance and Whole-Life Costs finns i följande kategorier:

Gör som tusentals andra bokälskare

Prenumerera på vårt nyhetsbrev för att få fantastiska erbjudanden och inspiration för din nästa läsning.