Marknadens största urval
Snabb leverans

The Critical Path and Other Writings on Critical Theory, 1963-1975

Om The Critical Path and Other Writings on Critical Theory, 1963-1975

This volume, which collects Northrop Frye's writings on the theory of literary criticism from the middle period of his career, includes one of Frye's own favourites, The Critical Path (1971).

Visa mer
  • Språk:
  • Engelska
  • ISBN:
  • 9780802096258
  • Format:
  • Inbunden
  • Sidor:
  • 496
  • Utgiven:
  • 14. mars 2009
  • Mått:
  • 245x170x44 mm.
  • Vikt:
  • 990 g.
Leveranstid: 2-4 veckor
Förväntad leverans: 27. januari 2025
Förlängd ångerrätt till 31. januari 2025
  •  

    Kan ej levereras före jul.
    Köp nu och skriv ut ett presentkort

Beskrivning av The Critical Path and Other Writings on Critical Theory, 1963-1975

This volume, which collects Northrop Frye's writings on the theory of literary criticism from the middle period of his career, includes one of Frye's own favourites, The Critical Path (1971).

Användarnas betyg av The Critical Path and Other Writings on Critical Theory, 1963-1975



Hitta liknande böcker
Boken The Critical Path and Other Writings on Critical Theory, 1963-1975 finns i följande kategorier:

Gör som tusentals andra bokälskare

Prenumerera på vårt nyhetsbrev för att få fantastiska erbjudanden och inspiration för din nästa läsning.